Signals 1m ago
Scope: All seven Emirates — 12 sites12 sites · 100% of network volume · 20 open exceptionsEvery module KPI, table, alert and chart below is filtered to this scope.
Scope signals 1m ago

Capital Catering Command Centre

Real-time operating visibility across 20+ locations and seven Emirates. Existing platforms remain systems of record; IOTx is the system of intelligence and accountability.

Operational health
68
Composite of OTIF, rework, demand confidence
Sites at risk
3
Health below 70
Planned meals today
6,304
Plan v12
Actual meals prepared
2,429
Live from execution board
OTIF
88.7%
Rework rate
16.7%
Audit baseline ~20%
Capacity hours at risk
118 h
Unresolved critical exceptions
4
SLA-tracked

Executive focus · Seven-Emirate operational health

Primary metrics, queue and recommended actions change with the selected demo role.

IOTx flow engine
Operational health
68
Seven-Emirate composite score
On-time-in-full
88.7%
Target 95%
Rework rate
16.7%
Audit baseline ~20%
Capacity hours at risk
118 h
Of 500 h weekly leak
Completion-to-billing leakage
AED 15,780
Delivered, not invoiced

Seven-Emirate operational health

Click an Emirate to filter the whole control tower to that region.

EmirateSitesHealthOpen exceptionsOTIFReworkDemand confidenceHighest-risk issue
Abu Dhabi3
62
786.4%21.8%71%Ward 04 attendance not refreshed before lock
Dubai3
54
981.2%24.6%66%Supplier ETA slip on PO-1048 hits locked plan
Sharjah2
71
489.7%18.3%78%Diet mismatch detected on Site 07 renal trays
Ajman1
83
293.1%11.2%88%Receiving queue ageing above 90 minutes
Umm Al Quwain1
88
195.0%8.4%91%Attendance still submitted on paper form
Ras Al Khaimah1
68
384.9%19.1%74%Unit 03 dispatch load not ready by cut-off
Fujairah1
79
290.5%13.7%82%Site receipt confirmation arriving by WhatsApp
LegendHealthy 80+Watch 65-79At risk below 65

What needs attention now?

Top five next-best actions generated by the IOTx flow engine.

  1. 1

    Confirm attendance for Abu Dhabi Ward 04 before the lock window closes.

    CriticalOwner Hessa Al DhaheriEX-2007
  2. 2

    Expedite PO-1048 because it affects tomorrow's locked production plan.

    CriticalOwner Areef Mohammed IsmailEX-2001
  3. 3

    Review 38-meal variance at Dubai Central Kitchen.

    HighOwner Nadia FaroukEX-2009
  4. 4

    Assign backup owner for an unacknowledged production task.

    MediumOwner Layla HassanEX-2008
  5. 5

    Reconcile completed delivery CC-2381 with its invoice.

    MediumOwner Huda KamalEX-2005

Expected versus actual performance

Planned meals against prepared, dispatched, received and rework volume.

IOTx flow engineUpdated 2m ago

Critical exceptions queue

Managers work from prioritised exceptions instead of chasing every task.

SeverityExceptionSiteCreatedOwnerSLAStatusSourceRecommended next action
Critical
EX-2001
PO-1048 ETA slipped past locked plan PP-507
Dubai Central Kitchen05:40Areef Mohammed Ismail
Nadia Farouk
SLA breached 42mIn progressERPExpedite PO-1048 or substitute chicken thigh from PO-1047
Critical
EX-2004
Dispatch not ready for Ras Al Khaimah Unit 03
Ras Al Khaimah Unit 0308:12Mariam Yousuf
Omar Bin Saif
SLA breached 11mIn progressIOTx flow engineRelease backup trolleys and record revised departure
Critical
EX-2007
Late attendance update from Abu Dhabi Ward 04
Abu Dhabi Central Kitchen07:05Hessa Al Dhaheri28m to SLANewWhatsApp intakeConfirm attendance for Ward 04 before the 08:30 lock window closes
Critical
EX-2010
PO-1051 low-potassium vegetables overdue, renal plan on hold
Al Ain Medical Ward06:45Rashed Al Mazrouei
Areef Mohammed Ismail
SLA breached 52mIn progressERPApprove substitution or reallocate stock from Al Ain Unit 03
High
EX-2002
D-3109 attendance revised 512 → 486 after lock
Dubai Central Kitchen06:58Nadia Farouk21m to SLAAcknowledgedERPReview 26-meal variance before dispatch staging
High
EX-2003
Diet mismatch detected for Sharjah Site 07 renal trays
Sharjah Site 0707:12Layla Hassan20m to SLANewWhatsApp intakeConfirm renal diet list with Ward 07-A and re-issue trays
Medium
EX-2005
CC-2381 delivered and accepted but not reconciled with invoice
Abu Dhabi Central Kitchen20 Aug 15:20Huda Kamal460m to SLAWaitingAccounting softwareReconcile completed delivery CC-2381 with invoice INV-8841
High
EX-2006
Production plan changed without approval (v11 → v12)
Dubai Central Kitchen06:48Areef Mohammed Ismail26m to SLAAcknowledgedExcel / Google SheetsObtain planning lead approval and record change reason
Medium
EX-2008
T-9014 renal QC check unacknowledged beyond SLA
Sharjah Site 0708:35Layla Hassan
Tariq Bilal
SLA breached 7mAcknowledgedIOTx flow engineAssign backup owner for the unacknowledged QC task
High
EX-2009
38-meal variance detected at Dubai Central Kitchen
Dubai Central Kitchen20 Aug 10:40Nadia Farouk
Reem Sultan
SLA breached 35mIn progressIOTx flow engineReview 38-meal variance and tag root cause

Operational funnel

Demand to cash, with conversion and variance at every stage.

Demand received6,280 · 100.0%
31 site/ward records
Demand locked6,031 · 96.0%
4 records still open
Plan published6,031 · 100.0%
Plan v12
Production completed5,540 · 91.9%
2 batches on hold
Dispatched5,210 · 94.0%
3 loads not ready
Received5,060 · 97.1%
18 shortage meals
Reconciled4,640 · 91.7%
4 deliveries unreconciled
Billed4,180 · 90.1%
AED 12,584 unbilled

Demand confidence and coordination load

Demand confidence is the leading indicator for rework and late delivery.

IOTx flow engine
Average demand confidence
81%
Across 31 site/ward demand records
Coordination overhead
70%
Staff time chasing updates and re-entering data
Report preparation
20 h / month
Manual assembly across tools