Quality & Rework Intelligence
Roughly one in five orders needs correction today. IOTx compares expected against actual output, ties every rework event back to the source event that caused it, prices the waste, and tracks the corrective action until it is closed.
Rework rate
5.2%
187 of 3,600 planned meals
IOTx flow engineUpdated 4m ago
Waste cost
AED 3,738
Ingredient + labour recovery cost
Upstream data causes
44%
Attendance, diet change, miscommunication
Open corrective actions
12
3 closed and verified
Events escalated
0
Rework spike exceptions raised from this board
Root-cause Pareto
Where the meal-count errors actually originate.
Rework rate trend
Weekly rework as a share of planned meals, with recovery cost.
Rework events
Every variance with its causing source event, owner, waste cost and corrective action state.
LegendUpstream data causeExecution causeAction closed
| Event | Site / menu | Planned | Actual | Rework | Root cause | Source event | Waste | Corrective action | Actions |
|---|---|---|---|---|---|---|---|---|---|
RW-701 Morning · B-DXB-A1 | Dubai Central Kitchen Standard Lunch A | 512 | 474 | 38 | Wrong attendance data | D-3109 attendance revised after lock | AED 646 | Move Ward 11 to IOTx attendance form Nadia FaroukOpen | |
RW-702 Morning · B-SHJ-R1 | Sharjah Site 07 Renal Diet | 76 | 70 | 6 | Late diet change | D-3118 diet change 07:12 | AED 210 | Enforce 07:00 diet lock with acknowledgement Layla HassanOpen | |
RW-703 Morning · B-AUH-S1 | Abu Dhabi Central Kitchen Soft / Pureed | 64 | 61 | 3 | Miscommunication | WhatsApp count relayed verbally | AED 96 | Structured intake replaces chat handoff Salma IdrisClosed 21 Aug 09:40 | |
RW-704 Afternoon · B-JBA-B2 | Jebel Ali Site 12 Standard Lunch B | 445 | 421 | 24 | Production execution error | Batch temperature deviation | AED 408 | Add mid-batch QC checkpoint Karim NasserOpen | |
RW-705 Morning · B-ALN-R1 | Al Ain Medical Ward Renal Diet | 92 | 78 | 14 | Material issue | PO-1051 low-potassium vegetables late | AED 490 | Approve substitute list for renal menu Rashed Al MazroueiOpen | |
RW-706 Morning · B-SHI-C1 | Sharjah Industrial Kitchen Staff Canteen Buffet | 540 | 528 | 12 | QC failure | Hold temperature below threshold | AED 204 | Recalibrate hot-hold units Tariq BilalOpen | |
RW-707 Morning · B-MAR-B1 | Dubai Marina Service Unit Standard Lunch B | 210 | 198 | 12 | Dispatch mismatch | CC-2387 received 198 of 210 | AED 204 | Scan-based load verification at gate Imran QureshiOpen | |
RW-708 Morning · B-RAK-A1 | Ras Al Khaimah Unit 03 Standard Lunch A | 232 | 220 | 12 | Material issue | Insulated trays unavailable | AED 198 | Raise minimum tray buffer stock Mariam YousufOpen | |
RW-709 Afternoon · B-U03-H1 | Al Ain Unit 03 High Protein | 145 | 138 | 7 | Wrong attendance data | Sheet import overwrote ward update | AED 154 | Lock sheet import after 07:00 Bilal AhmedOpen | |
RW-710 Morning · B-FUJ-B1 | Fujairah Service Unit Diabetic Diet | 74 | 71 | 3 | Late diet change | Ward call at 07:35 | AED 84 | Ward diet lock reminder at 06:30 Omar Bin SaifClosed 20 Aug 16:00 | |
RW-711 Morning · B-AJM-S1 | Ajman Ward Cluster Soft / Pureed | 46 | 44 | 2 | Unknown | Variance found at reconciliation | AED 62 | Add reason code at completion Fatima NoorOpen | |
RW-712 Night · B-DXB-D1 | Dubai Central Kitchen Diabetic Diet | 132 | 120 | 12 | Miscommunication | Night handover note on paper | AED 268 | Digital shift handover checklist Reem SultanOpen | |
RW-713 Morning · B-SHJ-A1 | Sharjah Site 07 Standard Lunch A | 288 | 274 | 14 | Wrong attendance data | Ward 07-B count double-counted | AED 238 | Duplicate detection on demand intake Layla HassanOpen | |
RW-714 Afternoon · B-UAQ-A1 | Umm Al Quwain Site 02 Standard Lunch A | 124 | 118 | 6 | Production execution error | Portion weight deviation | AED 102 | Portion scale calibration Saeed Al AliClosed 20 Aug 12:30 | |
RW-715 Morning · B-JBA-A1 | Jebel Ali Site 12 Standard Lunch A | 620 | 598 | 22 | QC failure | Sauce batch rejected at QC | AED 374 | Supplier spec review Vinod MenonOpen |